Azura Al Mouj Compared: Azura 1, 2, 3 and 4 — Which Phase to Buy?
Four phases, one beachfront collection. A sourced comparison of Azura 1, 2, 3 and 4 at Al Mouj Muscat: which are sold out, what each offers, how handover and payment plans differ and what current listings ask.

Azura Al Mouj is a four-phase beachfront collection in the Marsa District of Al Mouj Muscat, and the phases are not interchangeable: Azura 1 and 2 are reported sold out by the developer, Azura 3 and 4 are the final release, and handover targets run from 2028 to 2029. This guide compares Azura 1, 2, 3 and 4 in one table, then explains how they differ in home types, payment plans and current asking prices, so you can decide which phase suits your timeline, budget and residency goals.
- Scope
- Azura Beach Residences phases 1–4, Al Mouj Muscat
- Data cut-off
- 22 November 2026
- Price rule
- “From” asking prices only, dated
- Not covered
- Other Al Mouj projects; rental yield
- Phases4●Azura 1–4 two reported sold outPhase I in July 2025, Phase II in October 2025, per the developer [4]
- Handover targets2028–29●developer targets Azura 1–2: 2028; Azura 3–4: 2029Targets are not guarantees [7][8][9][10]
- Lowest asking priceOMR 94,802●Azura 4 1-bedroom, 80 m², 22 Nov 2026Azura 3 has no listing today [11]
Azura Al Mouj phases at a glance
The table sets the four phases side by side using Homelist project pages, developer announcements and live listings. Details and sources follow in the sections below; “our reading” marks interpretation rather than a published fact.
| Phase | Status and handover target | Homes and types | Payment plan | Lowest asking price |
|---|---|---|---|---|
| Azura 1 | Reported sold out in July 2025 [4]; target 2028 [7] | Homelist page publishes no unit schedule; both current listings are 3-bedroom, 168 m² [7][11] | Not published [7] | OMR 288,800 (3-bedroom) [11] |
| Azura 2 | Reported sold out in October 2025 [4]; target 2028 [8] | About 309 homes: 286 apartments (1–4 bedrooms) and 23 chalets (4–5 bedrooms) with private pools [8] | 10% booking, 75% during construction, 15% on handover [8] | OMR 129,600 (1-bedroom + study, 118 m²) [11] |
| Azura 3 | Launched with Phase IV in early 2026 [5][6]; target 2029 [9] | Dual beach-and-marina frontage; with Phase IV about 570 apartments and 41 four-bedroom duplex chalets [4][9] | 10% / 75% / 15% [9] | No listing on 22 Nov 2026 [11] |
| Azura 4 | On sale since 2026 [10]; target 2029 [10] | One apartment building (ground + 11 floors) and three-level chalets; 11 unit types, 1–4 bedrooms, 70–305 m² [10] | 10% / 75% / 15% [10] | OMR 94,802 (1-bedroom, 80 m²) [11] |
How the four Azura phases came to market
Azura Beach Residences was announced in July 2025 as a collection of beachfront and marina-view homes in the West Point precinct of the Marsa District, with dual-frontage homes facing both the beach and the marina [2]. It was then released in phases, and the developer describes the first two as a “record sell-out” [4].

- Jul 2025
Collection announced
Al Mouj Muscat launched Azura Beach Residences, with apartments and four-bedroom chalets and homes facing both beach and marina [2]. The developer says Phase I sold out that month [4].
- Oct 2025
Phase II sold out
The developer reported Phase II sold out in October 2025, after a phase announcement of 307 residences [3][4].
- Early 2026
Final release: III and IV
Phases III and IV came to market together, about 570 apartments and 41 four-bedroom duplex chalets, offered with freehold for all nationalities [4][5][6].
- 2028–29
Handover targets
Azura 1 and 2 target 2028; Azura 3 and 4 target 2029, according to Homelist project pages [7][8][9][10].
Two points follow from this timeline. First, a buyer today is choosing between sold-out phases, where the seller is usually another buyer, and the final release, where the developer is still selling [4][10]. Second, the final release is the only part of the collection that is still under the developer's current sales terms (our reading).
Azura 1 and 2: the sold-out phases
Azura 2 is the better documented of the two. Homelist's page lists about 309 homes: 286 apartments from one to four bedrooms and 23 four- and five-bedroom chalets with private pools, with a 2028 handover target [8]. The same 309 figure appears in the July 2025 launch report [2], while the Phase II announcement speaks of 307 residences [3]. Sources disagree by two units, so ask the seller for the unit schedule of the exact phase. Azura 1 is thinner: Homelist's page is built from two listings, shows a 2028 target and publishes no unit counts or payment plan [7].

Apartment or chalet?
Both home types exist in the collection, but they are very different purchases, so compare like with like.
Because the developer reports both phases sold out, we read the Azura 1 and 2 listings as resales or assignments of earlier contracts. Homelist listings do not say who the seller is, so ask, and ask whether the developer permits a transfer before you pay a deposit.
Azura 3 and 4: the final release
Azura 3 and Azura 4 launched together and are described as the final phases of the collection [4][6]. Azura 4 is the better documented: one apartment building of ground plus 11 floors facing the marina, and a row of three-level oceanfront chalets, with 11 unit types from 70 to 305 m² [10]. Azura 3 is marketed on its dual-frontage design, with homes offering both beach and marina views and direct beachfront access [9].

Beach on one side, marina on the other
Dual frontage is the main selling point of the final release, and it is also a reason to check the exact unit: only some homes will see both.
Both phases target a 2029 handover and share the 10%, 75% and 15% payment structure [9][10]. Azura 3 has no live listing on Homelist today, so we show no price for it [11]; ask the developer's sales team for the current price list instead.
Azura prices: what listings show
Listings are asking prices, not sale prices, and the three phases with listings mix very different homes, so the table shows each phase's range and our own price-per-square-metre calculation from the 16 Azura listings on 22 November 2026 [11]. Azura 2 and Azura 4 start at similar levels per square metre; the single Azura 1 home is the most expensive per square metre, but it is also the largest typical unit (our reading).
Azura 3 has no listing. Asking prices differ by floor, view and layout; this is not a valuation [11].
| Phase | Listings | Lowest ask (OMR) | Highest ask (OMR) | Per m² (OMR, our calculation) |
|---|---|---|---|---|
| Azura 1 | 2 | 288,800 | 288,800 | about 1,719 |
| Azura 2 | 6 | 129,600 | 246,111 | about 1,098–1,721 |
| Azura 3 | 0 | — | — | — |
| Azura 4 | 8 | 94,802 | 307,000 | about 1,116–1,827 |
Which Azura phase fits you?
Pick the profile closest to yours; the three points on each tab are the ones to test first.
Wants 2028
Budget-led
Needs space
Rules, residency and fees for Azura buyers
Before you pay for any Azura phase, check the paperwork. The Ministry of Housing and Urban Planning says a developer needs a development licence, then a project licence that includes opening an escrow account with a local bank before off-plan units are sold, then an advertising permit, and its Director-General urged buyers to confirm that both the developer and the project are licensed before paying or signing [1]. Foreigners can own freehold in designated tourism complexes such as Al Mouj [12]. Registration costs 3% of the price plus a fee of OMR 25 for the form for non-Omanis [15].
Five steps to choose your Azura phase
Compare like with like
Compare the same bedroom count and view across phases, using price per square metre as a cross-check [11].
Verify before you pay
Check the developer licence, the project licence and the escrow account, and pay only into the escrow account [1].
Checklist before you reserve
- You know which phase and which unit type you are buying, and its exact area [10].
- You have the developer licence, project licence and escrow details in writing [1].
- If you buy in Azura 1 or 2, you know who the seller is and whether the developer allows a transfer [4].
- You have the payment schedule and the handover date and delay remedies in the contract [8][9][10].
- You have budgeted 3% registration plus the OMR 25 form fee [15].
- You have checked the residency rule that applies on the day you sign [13][14].
Conclusion
The four Azura phases are one collection with four different purchases. Azura 1 and 2 offer an earlier 2028 target but come second-hand and thinly documented; Azura 4 has the lowest entry price and the fullest project data; Azura 3 offers the dual beach-and-marina frontage but no public price today. Whichever you pick, compare the same home type, treat handover years as targets and verify licences and escrow first.
Read how Azura fits among all 19 projects in the Al Mouj neighbourhoods guide [16], open Azura 1, Azura 2, Azura 3 or Azura 4, or ask our team for current availability.
Frequently asked questions
What is Azura Al Mouj?
Azura Beach Residences is a four-phase collection of beachfront and marina-view apartments and chalets by Al Mouj Muscat in the Marsa District, with freehold ownership for all nationalities.
Which Azura phases are sold out?
The developer says Phase I sold out in July 2025 and Phase II in October 2025. Azura 3 and 4 are the final release.
When will each Azura phase be handed over?
Homelist project pages show developer targets of 2028 for Azura 1 and 2, and 2029 for Azura 3 and 4. Targets are not guarantees.
Which Azura phase is cheapest?
On 22 November 2026 the lowest asking price was OMR 94,802 for an 80 m² 1-bedroom in Azura 4. Azura 3 has no listing, so it cannot be compared.
What is the payment plan?
Homelist shows 10% at booking, 75% during construction and 15% on handover for Azura 2, 3 and 4. No plan is published for Azura 1.
What is special about Azura 3?
It is marketed as a dual-frontage design with homes offering both beach and marina views and direct beachfront access.
Does buying in Azura give me residency?
The developer says owners may be eligible for a residence visa. The 10-year Golden Residency needs a completed, titled unit worth OMR 200,000 or more, so an off-plan unit does not qualify yet.
How many homes are in Azura 2?
Homelist lists about 309 homes, 286 apartments and 23 chalets, while a developer announcement for Phase II speaks of 307 residences. Ask for the exact unit schedule.
Last checked: Project facts, rules and listing prices were checked on 22 November 2026 against the developer's announcements, Homelist project pages and listings, and the official sources below. Where sources disagree we say so. Homelist reviews this guide every six months or when a phase changes status.
General information, not legal, tax, immigration or investment advice, and not reviewed by a lawyer. Prices are asking prices from Homelist listings on 22 November 2026 and shown as “from” figures only. Handover years are developer targets, not guarantees. Illustrations are not site plans. Homelist is a platform and does not guarantee availability, resale value, handover dates or residency. Before you pay, confirm the developer and project licences, the escrow account, the unit schedule and the contract.
Sources and official references
- Oman Observer (25 Jul 2026) — Oman reinforces property market rules: development licence, project licence with escrow, advertising permit
- Oman Observer (Jul 2025) — Azura Beach Residences launch: 309 homes, dual-frontage, West Point precinct
- Zawya press release — Al Mouj Muscat unveils Azura Beach Residences Phase 2 (307 residences)
- Zawya press release — Final release of Azura Beach Residences III and IV: 570 apartments and 41 chalets; Phase I sold out July, Phase II October 2025
- Oman Observer (14 Feb 2026) — Azura Beach Residences III and IV: 570 apartments and 41 chalets; freehold for all nationalities
- Gulf Construction (2026) — Final phases of Al Mouj Muscat residences launched
- Homelist Oman — Azura 1 Al Mouj project page (derived from listings; handover target 2028)
- Homelist Oman — Azura 2 Al Mouj project page: units, payment plan 10/75/15, handover target 2028
- Homelist Oman — Azura 3 Al Mouj project page: dual frontage, payment plan 10/75/15, handover target 2029
- Homelist Oman — Azura 4 Al Mouj project page: unit mix 1–4 bedrooms 70–305 m², payment plan, handover target 2029
- Homelist Oman — Azura listings in Al Mouj, snapshot 22 Nov 2026 (16 asking prices; Azura 3 has none)
- Gov.om / Ministry of Housing and Urban Planning — Own real estate in tourist complexes
- Oman Observer (31 Aug 2025) — Oman launches 10-year Golden Residency (OMR 200,000+; completed property with title)
- Khaleej Times (25 Aug 2025) — Oman Golden Visa explained (reported property tiers OMR 500,000 / 250,000)
- Ministerial Decision 570/2025 — MoHUP fees (3% registration; OMR 25 form for non-Omanis)
- Homelist Oman — Al Mouj neighbourhoods guide: 19 projects compared (22 Nov 2026)


